Home > Historic Buildings > Brabyns Hall > Iron Bridge Restoration
Can your business or organisation help support this site too?

2008-04-02 Gas Main Rerouting / First SHS Installation

The smaller central arched ribs are cast in in single sections (joined in the middle) and the rings on these are part of the same casting. You can see here where plates have been bonded to the bottom arch of the rib to strengthen it.

Img_1748a.jpg Img_1749a.jpg Img_1751a.jpg Img_1752a.jpg Img_1753a.jpg
Rate this file (Current rating : 5 / 5 with 1 votes)