Home > Historic Buildings > Brabyns Hall > Iron Bridge Restoration
Can your business or organisation help support this site too?

2007-10-01 Grit blasting

The cast date at the apex. Removing the paint has revealed the flush heads of the bolts holding the two rib sections together and it is interested to see that each hand-made bolt was numbered with pock-marks during trial assembly. This was so that they could be put back in the same location when erected on site.

116_1652a.jpg 116_1655a.jpg 116_1657a.jpg 116_1656a.jpg 116_1658a.jpg
Rate this file (No vote yet)