Most viewed - Brabyns Hall |
2008-04-02 Gas Main Rerouting / First SHS Installation198 viewsA view of the crane preparing to lift the SHS into position immediately above where this photo is taken from.
|
|
2008-04-02 Gas Main Rerouting / First SHS Installation197 viewsPreparing to lift the SHS off the delivery wagon.
|
|
2008-06-06 Modern Intervention197 viewsHorse mounting blocks being constructed on the park side of the bridge.
|
|
2008-04-02 Gas Main Rerouting / First SHS Installation195 viewsNational Grid's contractor has bee carrying out preparatory work in advance of the first SHS being installed.
|
|
2008-04-02 Gas Main Rerouting / First SHS Installation194 viewsA close up of the largest of the cast iron rings bolted into the outer arched ribs.
|
|
2008-04-25 Gas Main Diversion194 viewsThe new gas main diversion can be seen here in yellow plastic pipe.
|
|
2008-04-25 Gas Main Diversion194 viewsGas workers during the diversion of the gas main over the Iron Bridge.
|
|
2008-05-06 Second SHS Installed194 viewsThe bridge is ready for the second Steel Hollow Box Section to be installed.
|
|
2008-06-06 Modern Intervention194 viewsPeter inspects the chicane arrangement on the Rollins Lane side.
|
|
2008-04-29 Gas Main Diversion193 viewsA closer shot of the bridge with gas main removed. Notice how straight the handrails are now too.
|
|
2008-05-06 Second SHS Installed193 viewsThe Bailey Bridge is broken up ready to be taken away on the wagon that delivered the SHS. Hurrah!
|
|
2008-05-29 Concrete Decking193 viewsThe concrete decking has now cured. Photo Aidan / Oly.
|
|
490 files on 41 page(s) |
|
38 | |
|