Most viewed - Historic Buildings |
2008-02-08 3d Design209 viewsA screen capture of the final 3d handrail end detail design viewed from the approach to the bridge.
|
|
2008-04-02 Gas Main Rerouting / First SHS Installation209 viewsYou can see here the plastic gas main that was threaded through the SHS at the fabricators.
|
|
2008-06-06 Modern Intervention208 viewsA view across the bridge from the Rollins Lane side showing the new internal parapet posts partially installed.
|
|
2008-06-06 Modern Intervention208 viewsAnother close up of the modern internal parapet posts.
|
|
2008-06-06 Modern Intervention208 viewsA view showing the termination of the hollow box section housing services across the bridge.
|
|
2008-02-12 Strengthening Works206 viewsA view of the new bracing between the central arched rib on the left and one of the outer ribs.
|
|
2008-05-16 New Deck Installation206 viewsServices running through the second steel hollow box section.
|
|
2008-05-23 Concrete Deck206 viewsLevelling up the approach to the bridge on the Rollins Lane side.
|
|
2008-05-23 Concrete Deck205 viewsAbutments repointed and railings repaired.
|
|
2008-05-23 Concrete Deck205 viewsA trowelled finish is applied to the concrete infill.
|
|
2008-06-06 Modern Intervention205 viewsA wide angle view from the park side of the bridge.
|
|
Painting of Marple Hall205 viewsA watercolour painting of Marple Hall.
|
|
1008 files on 84 page(s) |
|
79 | |
|