Most viewed - Iron Bridge Restoration |
2008-04-25 Gas Main Diversion194 viewsGas workers during the diversion of the gas main over the Iron Bridge.
|
|
2008-05-06 Second SHS Installed194 viewsThe bridge is ready for the second Steel Hollow Box Section to be installed.
|
|
2008-06-06 Modern Intervention194 viewsPeter inspects the chicane arrangement on the Rollins Lane side.
|
|
2008-04-29 Gas Main Diversion193 viewsA closer shot of the bridge with gas main removed. Notice how straight the handrails are now too.
|
|
2008-05-06 Second SHS Installed193 viewsThe Bailey Bridge is broken up ready to be taken away on the wagon that delivered the SHS. Hurrah!
|
|
2008-05-29 Concrete Decking193 viewsThe concrete decking has now cured. Photo Aidan / Oly.
|
|
2008-06-06 Modern Intervention193 viewsA shiney restored bridge begins to emerge from the scaffold.
|
|
2008-06-06 Modern Intervention193 viewsA view across the bridge from the park side showing the finshed surface (covered).
|
|
2008-06-06 Modern Intervention193 viewsA close up of the new parapet posts. Stainless steel wires will run through the holes.
|
|
2008-04-02 Gas Main Rerouting / First SHS Installation192 viewsA view from beneath the bridge showing where the SHS will soon be placed.
|
|
2008-04-29 New Railings192 viewsSpot the new railings - sevral of the railings were broken and have now been replaced.
|
|
2008-05-06 Second SHS Installed192 viewsThe second SHS is set in place.
|
|