Most viewed - Iron Bridge Restoration |
2008-06-06 Modern Intervention208 viewsA view showing the termination of the hollow box section housing services across the bridge.
|
|
2008-02-12 Strengthening Works206 viewsA view of the new bracing between the central arched rib on the left and one of the outer ribs.
|
|
2008-05-16 New Deck Installation206 viewsServices running through the second steel hollow box section.
|
|
2008-05-23 Concrete Deck206 viewsLevelling up the approach to the bridge on the Rollins Lane side.
|
|
2008-05-23 Concrete Deck205 viewsAbutments repointed and railings repaired.
|
|
2008-05-23 Concrete Deck205 viewsA trowelled finish is applied to the concrete infill.
|
|
2008-06-06 Modern Intervention205 viewsA wide angle view from the park side of the bridge.
|
|
2008-02-12 Strengthening Works204 viewsAttachments for diagonal bracing are added to the top of an outer arched rib.
|
|
2008-04-02 Gas Main Rerouting / First SHS Installation204 viewsHere it comes. The SHS already has a length of 6" plastic gas main inside it that will be connected up once it is in position. Then the old gas main can be removed.
|
|
2008-04-02 Gas Main Rerouting / First SHS Installation202 viewsA view of all three arched ribs with their rings on the Rollins Lane side of the river.
|
|
2008-04-02 Gas Main Rerouting / First SHS Installation202 viewsThe SHS is carefully manouvred into its final position.
|
|
2008-04-02 Gas Main Rerouting / First SHS Installation202 viewsYou can see here how that troublesome notching of the SHS ties up with the edge beam of the original bridge so the the new beam sits as low as possible.
|
|
299 files on 25 page(s) |
|