Most viewed - Iron Bridge Restoration |
2008-02-08 3d Design216 viewsAn early version of the 3d design for the hollow box section and internal parapets. Notice two options for the handrail end details.
|
|
2008-04-02 Gas Main Rerouting / First SHS Installation215 viewsThe central point of the SHS. See how the plates for the inner parapet posts line up with the existing post locations.
|
|
2008-05-16 Wing Walls and Rails214 viewsRailings after repair and priming awaiting a final coat of white.
|
|
2008-05-23 Concrete Deck214 viewsThe concrete infill is applied to the new steel deck. The box-outs are inspection pits for the bearings.
|
|
2008-05-29 a Leafy View214 viewsA leafy view of the bridge before scaffold removal begins. Photo Aidan / Oly.
|
|
2008-04-02 Gas Main Rerouting / First SHS Installation213 viewsThe SHS will be lifted onto the bridge and set against the flange of the original cast iron outer rib, which has been painted white before it is covered up.
|
|
2008-05-23 Concrete Deck210 viewsA wide angle view of the approach on the park side during application of the concrete infill over the steel deck.
|
|
2008-02-12 Strengthening Works209 viewsA close up of the new connections for the diagonal bracing, again attached using existing holes.
|
|
2008-02-08 3d Design209 viewsA screen capture of the final 3d handrail end detail design viewed from the approach to the bridge.
|
|
2008-04-02 Gas Main Rerouting / First SHS Installation209 viewsYou can see here the plastic gas main that was threaded through the SHS at the fabricators.
|
|
2008-06-06 Modern Intervention208 viewsA view across the bridge from the Rollins Lane side showing the new internal parapet posts partially installed.
|
|
2008-06-06 Modern Intervention208 viewsAnother close up of the modern internal parapet posts.
|
|