2008-05-16 Wing Walls and RailsIt's a long time since the railings on the iron bridge have looked this good.
|
|
2008-05-16 Wright's LogoBoth of the handrail centre pieces with Nathaniel Wright's logo at the apex of the bridge have been repaired and reinstalled.
|
|
2008-05-23 Concrete DeckAbutments repointed and railings repaired.
|
|
2008-05-23 Concrete DeckThe concrete infill is applied to the new steel deck. The box-outs are inspection pits for the bearings.
|
|
2008-05-23 Concrete DeckThe underside of the steel deck after grouting between the cast iron bridge and the hollow box section beams.
|
|
2008-05-23 Concrete DeckA trowelled finish is applied to the concrete infill.
|
|
2008-05-23 Concrete DeckLevelling up the approach to the bridge on the Rollins Lane side.
|
|
2008-05-23 Concrete DeckA wide angle view of the approach on the park side during application of the concrete infill over the steel deck.
|
|
2008-05-29 a Leafy ViewA leafy view of the bridge before scaffold removal begins. Photo Aidan / Oly.
|
|
2008-05-29 Concrete DeckingThe concrete decking has now cured. Photo Aidan / Oly.
|
|
2008-05-29 Under the BridgeLast close up views of the rings from under the bridge before the scaffold removal begins. Photo Aidan / Oly.
|
|
2008-05-29 Under the BridgeLast close up views of the rings from under the bridge before the scaffold removal begins. Photo Aidan / Oly.
|
|