2007-09-18 Under the bridgeA close up of the bolted centre connection joining two of the arched ribs. (1 votes)
|
|
2007-09-14 Project signThe new project sign is now in place. (1 votes)
|
|
2007-09-04 Removal of "fill"The gas main laid in the late 80s is re-exposed. (1 votes)
|
|
2007-09-03 03 Bailey Bridge RemovalView from the north of the Bailey bridge broken out and ready to go. (1 votes)
|
|
2007-08-31 Tree WorkDave Myers cuts the stump of the old beech tree to an angle. (1 votes)
|
|
2008-06-22 Opening CeremonyEveryone waves to the press photographers. Photo Arthur Procter. (1 votes)
|
|
2008-06-22 Opening CeremonyStockport Mayor Cllr. Pam King talks about the importance of heritage in the borough. (1 votes)
|
|
2007-10-05 PrimerThe inner and outer rings at the south abutment gleaming with their new coat of primer. (1 votes)
|
|
2007-09-20 Close upA close up of a VERY corroded tie rod. These are to be replaced by modern ties with diagonal bracing. (1 votes)
|
|
2007-09-04 Removal of "fill"Elsa inspects the gas pipe and water pipe that were buried in the fill. (1 votes)
|
|
|
|