Home > Historic Buildings > Brabyns Hall > Iron Bridge Restoration
Can your business or organisation help support this site too?

2008_4_29_022.jpg
2008-04-29 New RailingsSpot the new railings - sevral of the railings were broken and have now been replaced.
2008_4_29_023.jpg
2008-04-29 New RailingsMore railings have been replaced on the Iron Bridge Cottage side, can you spot which ones?
118_1809.jpg
2008-05-06 Second SHS InstalledThe bridge is ready for the second Steel Hollow Box Section to be installed.
118_1811.jpg
2008-05-06 Second SHS InstalledThe second SHS arrives on the back of a wagon and is prepared for lifting.
118_1813.jpg
2008-05-06 Second SHS InstalledThe Bailey Bridge is broken up ready to be taken away on the wagon that delivered the SHS. Hurrah!
118_1819.jpg
2008-05-06 Second SHS InstalledAny colour so long as it's white!
118_1822.jpg
2008-05-06 Second SHS InstalledDeck plates, which turned out to be painted on the wrong side and will cost a week's delay!
118_1821.jpg
2008-05-06 Second SHS InstalledSHS is lifted off the wagon to be installed.
118_1826.jpg
2008-05-06 Second SHS InstalledThe second SHS is set in place.
118_1829.jpg
2008-05-06 Second SHS InstalledThe abutments being prepared for pointing up.
118_1834.jpg
2008-05-06 Second SHS InstalledBoth beams are now in position.
118_1838.jpg
2008-05-06 Second SHS InstalledThose deck plates should be painted on the other side!
299 files on 25 page(s) 16