2008-04-29 New RailingsSpot the new railings - sevral of the railings were broken and have now been replaced.
|
|
2008-04-29 New RailingsMore railings have been replaced on the Iron Bridge Cottage side, can you spot which ones?
|
|
2008-05-06 Second SHS InstalledThe bridge is ready for the second Steel Hollow Box Section to be installed.
|
|
2008-05-06 Second SHS InstalledThe second SHS arrives on the back of a wagon and is prepared for lifting.
|
|
2008-05-06 Second SHS InstalledThe Bailey Bridge is broken up ready to be taken away on the wagon that delivered the SHS. Hurrah!
|
|
2008-05-06 Second SHS InstalledAny colour so long as it's white!
|
|
2008-05-06 Second SHS InstalledDeck plates, which turned out to be painted on the wrong side and will cost a week's delay!
|
|
2008-05-06 Second SHS InstalledSHS is lifted off the wagon to be installed.
|
|
2008-05-06 Second SHS InstalledThe second SHS is set in place.
|
|
2008-05-06 Second SHS InstalledThe abutments being prepared for pointing up.
|
|
2008-05-06 Second SHS InstalledBoth beams are now in position.
|
|
2008-05-06 Second SHS InstalledThose deck plates should be painted on the other side!
|
|