Home > Historic Buildings > Brabyns Hall > Iron Bridge Restoration
Can your business or organisation help support this site too?

0111.jpg
2008-02-12 Strengthening WorksA close up of the new connections for the diagonal bracing, again attached using existing holes.
0121.jpg
2008-02-12 Strengthening WorksA close up of the horizontal and diagonal bracing connection to the central arched rib.
AMP_0021.jpg
2008-03-12 The Story of Brabyns & Iron BridgeTutor Judith Wilshaw explains the history of Wright's Folly during a field trip on the Story of Brabyns and Iron Bridge course. (Arthur Procter)
AMP_0015.jpg
2008-03-12 The Story of Brabyns & Iron BridgeA group from the popular Story of Brabyns and Iron Bridge eduction course visit the bridge during restoration. (Arthur Procter)
AMP_0024.jpg
2008-03-12 The Story of Brabyns & Iron BridgeParticipants in the Story of Brabyns and Iron Bridge education course learn from from tutor Judith Wilshaw during a field trip. (Arthur Procter)
Img_1743a.jpg
2008-04-02 Gas Main Rerouting / First SHS InstallationNational Grid's contractor has bee carrying out preparatory work in advance of the first SHS being installed.
Img_1748a.jpg
2008-04-02 Gas Main Rerouting / First SHS InstallationA view from beneath the bridge showing where the SHS will soon be placed.
Img_1749a.jpg
2008-04-02 Gas Main Rerouting / First SHS InstallationThe rings in the outer arched ribs are bolted in place because the ribs were too large to be cast in a single piece. These are all primed filled and ready for their top coat of paint.
Img_1751a.jpg
2008-04-02 Gas Main Rerouting / First SHS InstallationThe smaller central arched ribs are cast in in single sections (joined in the middle) and the rings on these are part of the same casting. You can see here where plates have been bonded to the bottom arch of the rib to strengthen it.
Img_1752a.jpg
2008-04-02 Gas Main Rerouting / First SHS InstallationA view of all three arched ribs with their rings on the Rollins Lane side of the river.
Img_1753a.jpg
2008-04-02 Gas Main Rerouting / First SHS InstallationA view of all three arched ribs with their rings on the park side of the river. You can see where the plate bonding finishes on the central rib.
Img_1759a.jpg
2008-04-02 Gas Main Rerouting / First SHS InstallationA view of the crane preparing to lift the SHS into position immediately above where this photo is taken from.
299 files on 25 page(s) 13