Home > Historic Buildings > Brabyns Hall > Iron Bridge Restoration
Can your business or organisation help support this site too?

wc31207015.jpg
2007-12-03 River Goyt SwellsThe water levels are alamingly high at the beginning of December.
wc31207016.jpg
2007-12-03 River Goyt SwellsThe water levels are alamingly high at the beginning of December.
3d_2.jpg
2008-02-08 3d DesignA screen capture from an early version of the 3d design for the new internal parapets.
3d_1.jpg
2008-02-08 3d DesignAn early version of the 3d design for the hollow box section and internal parapets. Notice two options for the handrail end details.
3d_4.jpg
2008-02-08 3d DesignA screen capture of the final 3d handrail end detail design viewed from the approach to the bridge.
3d_3.jpg
2008-02-08 3d DesignA screen capture of the final 3d handrail end detail design viewed from the outside of the bridge (the old handrails will be in front of these).
0043.jpg
2008-02-12 Strengthening WorksAttachments for diagonal bracing are added to the top of an outer arched rib.
0053.jpg
2008-02-12 Strengthening WorksNew horizontal and diagonal bracing attached to the central arched rib.
0063.jpg
2008-02-12 Strengthening WorksA view of the new bracing between the central arched rib on the left and one of the outer ribs.
0071.jpg
2008-02-12 Strengthening WorksA view of the new bracing across the full width of the bridge.
0081.jpg
2008-02-12 Strengthening WorksA close up of one of the bracing connections to the central arched rib.
0101.jpg
2008-02-12 Strengthening WorksA close up of the new horizontal bracing utilising the existing holes in the outer ribs near to the centre.
299 files on 25 page(s) 12