Home > Historic Buildings > Brabyns Hall
Can your business or organisation help support this site too?

Most viewed - Brabyns Hall
Img_3492.jpg
2008-06-06 Modern Intervention195 viewsA shiney restored bridge begins to emerge from the scaffold.
Img_1748a.jpg
2008-04-02 Gas Main Rerouting / First SHS Installation194 viewsA view from beneath the bridge showing where the SHS will soon be placed.
Img_1751a.jpg
2008-04-02 Gas Main Rerouting / First SHS Installation194 viewsThe smaller central arched ribs are cast in in single sections (joined in the middle) and the rings on these are part of the same casting. You can see here where plates have been bonded to the bottom arch of the rib to strengthen it.
118_1822.jpg
2008-05-06 Second SHS Installed194 viewsDeck plates, which turned out to be painted on the wrong side and will cost a week's delay!
circles.jpg
2008-05-29 Under the Bridge194 viewsLast close up views of the rings from under the bridge before the scaffold removal begins. Photo Aidan / Oly.
Img_1753a.jpg
2008-04-02 Gas Main Rerouting / First SHS Installation193 viewsA view of all three arched ribs with their rings on the park side of the river. You can see where the plate bonding finishes on the central rib.
2008_4_29_022.jpg
2008-04-29 New Railings193 viewsSpot the new railings - sevral of the railings were broken and have now been replaced.
118_1826.jpg
2008-05-06 Second SHS Installed193 viewsThe second SHS is set in place.
Img_3494.jpg
2008-06-06 Modern Intervention193 viewsA shot from the tree stump that will eventually feature the interpretation plaque and be the main viewing point.
Img_3498.jpg
2008-06-06 Modern Intervention193 viewsA view across the bridge from the park side showing the finshed surface (covered).
Img_3503.jpg
2008-06-06 Modern Intervention193 viewsA close up of the new parapet posts. Stainless steel wires will run through the holes.
0081.jpg
2008-02-12 Strengthening Works192 viewsA close up of one of the bracing connections to the central arched rib.
490 files on 41 page(s) 39