Home > Historic Buildings > Brabyns Hall
Can your business or organisation help support this site too?

Most viewed - Brabyns Hall
118_1873a.jpg
2008-05-23 Concrete Deck201 viewsThe underside of the steel deck after grouting between the cast iron bridge and the hollow box section beams.
Img_1784a.jpg
2008-04-02 Gas Main Rerouting / First SHS Installation199 viewsPreparing to lift the SHS off the delivery wagon.
Img_3496.jpg
2008-06-06 Modern Intervention199 viewsHorse mounting blocks being constructed on the park side of the bridge.
Img_1743a.jpg
2008-04-02 Gas Main Rerouting / First SHS Installation198 viewsNational Grid's contractor has bee carrying out preparatory work in advance of the first SHS being installed.
Img_1761a.jpg
2008-04-02 Gas Main Rerouting / First SHS Installation197 viewsA close up of the largest of the cast iron rings bolted into the outer arched ribs.
Concete_Deck.jpg
2008-05-29 Concrete Decking197 viewsThe concrete decking has now cured. Photo Aidan / Oly.
Img_3500.jpg
2008-06-06 Modern Intervention197 viewsPeter inspects the chicane arrangement on the Rollins Lane side.
118_1809.jpg
2008-05-06 Second SHS Installed196 viewsThe bridge is ready for the second Steel Hollow Box Section to be installed.
Img_1751a.jpg
2008-04-02 Gas Main Rerouting / First SHS Installation195 viewsThe smaller central arched ribs are cast in in single sections (joined in the middle) and the rings on these are part of the same casting. You can see here where plates have been bonded to the bottom arch of the rib to strengthen it.
2008_4_25_0181.jpg
2008-04-25 Gas Main Diversion195 viewsThe new gas main diversion can be seen here in yellow plastic pipe.
2008_4_25_0172.jpg
2008-04-25 Gas Main Diversion195 viewsGas workers during the diversion of the gas main over the Iron Bridge.
2008_4_29_0201.jpg
2008-04-29 Gas Main Diversion195 viewsA closer shot of the bridge with gas main removed. Notice how straight the handrails are now too.