Most viewed - Brabyns Hall |
2008-05-23 Concrete Deck201 viewsThe underside of the steel deck after grouting between the cast iron bridge and the hollow box section beams.
|
|
2008-04-02 Gas Main Rerouting / First SHS Installation199 viewsPreparing to lift the SHS off the delivery wagon.
|
|
2008-06-06 Modern Intervention199 viewsHorse mounting blocks being constructed on the park side of the bridge.
|
|
2008-04-02 Gas Main Rerouting / First SHS Installation198 viewsNational Grid's contractor has bee carrying out preparatory work in advance of the first SHS being installed.
|
|
2008-04-02 Gas Main Rerouting / First SHS Installation197 viewsA close up of the largest of the cast iron rings bolted into the outer arched ribs.
|
|
2008-05-29 Concrete Decking197 viewsThe concrete decking has now cured. Photo Aidan / Oly.
|
|
2008-06-06 Modern Intervention197 viewsPeter inspects the chicane arrangement on the Rollins Lane side.
|
|
2008-05-06 Second SHS Installed196 viewsThe bridge is ready for the second Steel Hollow Box Section to be installed.
|
|
2008-04-02 Gas Main Rerouting / First SHS Installation195 viewsThe smaller central arched ribs are cast in in single sections (joined in the middle) and the rings on these are part of the same casting. You can see here where plates have been bonded to the bottom arch of the rib to strengthen it.
|
|
2008-04-25 Gas Main Diversion195 viewsThe new gas main diversion can be seen here in yellow plastic pipe.
|
|
2008-04-25 Gas Main Diversion195 viewsGas workers during the diversion of the gas main over the Iron Bridge.
|
|
2008-04-29 Gas Main Diversion195 viewsA closer shot of the bridge with gas main removed. Notice how straight the handrails are now too.
|
|
490 files on 41 page(s) |
|
38 | |
|