Home > Historic Buildings
Can your business or organisation help support this site too?

Most viewed - Historic Buildings
Img_3496.jpg
2008-06-06 Modern Intervention201 viewsHorse mounting blocks being constructed on the park side of the bridge.
Img_1784a.jpg
2008-04-02 Gas Main Rerouting / First SHS Installation200 viewsPreparing to lift the SHS off the delivery wagon.
Img_1743a.jpg
2008-04-02 Gas Main Rerouting / First SHS Installation199 viewsNational Grid's contractor has bee carrying out preparatory work in advance of the first SHS being installed.
Img_3500.jpg
2008-06-06 Modern Intervention199 viewsPeter inspects the chicane arrangement on the Rollins Lane side.
Img_1761a.jpg
2008-04-02 Gas Main Rerouting / First SHS Installation198 viewsA close up of the largest of the cast iron rings bolted into the outer arched ribs.
Img_3498.jpg
2008-06-06 Modern Intervention198 viewsA view across the bridge from the park side showing the finshed surface (covered).
Img_1751a.jpg
2008-04-02 Gas Main Rerouting / First SHS Installation197 viewsThe smaller central arched ribs are cast in in single sections (joined in the middle) and the rings on these are part of the same casting. You can see here where plates have been bonded to the bottom arch of the rib to strengthen it.
Img_1753a.jpg
2008-04-02 Gas Main Rerouting / First SHS Installation197 viewsA view of all three arched ribs with their rings on the park side of the river. You can see where the plate bonding finishes on the central rib.
Concete_Deck.jpg
2008-05-29 Concrete Decking197 viewsThe concrete decking has now cured. Photo Aidan / Oly.
Img_3492.jpg
2008-06-06 Modern Intervention197 viewsA shiney restored bridge begins to emerge from the scaffold.
Img_1748a.jpg
2008-04-02 Gas Main Rerouting / First SHS Installation196 viewsA view from beneath the bridge showing where the SHS will soon be placed.
2008_4_25_0181.jpg
2008-04-25 Gas Main Diversion196 viewsThe new gas main diversion can be seen here in yellow plastic pipe.
1008 files on 84 page(s) 81