Most viewed - Iron Bridge Restoration |
2008-04-02 Gas Main Rerouting / First SHS Installation203 viewsA view of all three arched ribs with their rings on the Rollins Lane side of the river.
|
|
2008-05-06 Second SHS Installed203 viewsBoth beams are now in position.
|
|
2008-05-16 New Deck Installation203 viewsThe new decking is installed between the hollow box section beams.
|
|
2008-02-12 Strengthening Works202 viewsNew horizontal and diagonal bracing attached to the central arched rib.
|
|
2008-04-02 Gas Main Rerouting / First SHS Installation201 viewsThe rings in the outer arched ribs are bolted in place because the ribs were too large to be cast in a single piece. These are all primed filled and ready for their top coat of paint.
|
|
2008-05-23 Concrete Deck201 viewsThe underside of the steel deck after grouting between the cast iron bridge and the hollow box section beams.
|
|
2008-04-02 Gas Main Rerouting / First SHS Installation199 viewsA view of the crane preparing to lift the SHS into position immediately above where this photo is taken from.
|
|
2008-04-02 Gas Main Rerouting / First SHS Installation199 viewsPreparing to lift the SHS off the delivery wagon.
|
|
2008-06-06 Modern Intervention199 viewsHorse mounting blocks being constructed on the park side of the bridge.
|
|
2008-04-02 Gas Main Rerouting / First SHS Installation197 viewsNational Grid's contractor has bee carrying out preparatory work in advance of the first SHS being installed.
|
|
2008-04-02 Gas Main Rerouting / First SHS Installation197 viewsA close up of the largest of the cast iron rings bolted into the outer arched ribs.
|
|
2008-06-06 Modern Intervention197 viewsPeter inspects the chicane arrangement on the Rollins Lane side.
|
|