Home > Historic Buildings > Brabyns Hall > Iron Bridge Restoration
Can your business or organisation help support this site too?

Most viewed - Iron Bridge Restoration
Img_3508.jpg
2008-06-06 Modern Intervention208 viewsA wide angle view from the park side of the bridge.
Img_3511.jpg
2008-06-06 Modern Intervention208 viewsAnother close up of the modern internal parapet posts.
Img_3510.jpg
2008-06-06 Modern Intervention208 viewsA view showing the termination of the hollow box section housing services across the bridge.
Img_1793a.jpg
2008-04-02 Gas Main Rerouting / First SHS Installation207 viewsHere it comes. The SHS already has a length of 6" plastic gas main inside it that will be connected up once it is in position. Then the old gas main can be removed.
118_1854b.jpg
2008-05-16 New Deck Installation207 viewsServices running through the second steel hollow box section.
118_1876a.jpg
2008-05-23 Concrete Deck207 viewsLevelling up the approach to the bridge on the Rollins Lane side.
Img_1812a.jpg
2008-04-02 Gas Main Rerouting / First SHS Installation206 viewsThe SHS is carefully manouvred into its final position.
118_1874a.jpg
2008-05-23 Concrete Deck206 viewsAbutments repointed and railings repaired.
118_1875a.jpg
2008-05-23 Concrete Deck206 viewsA trowelled finish is applied to the concrete infill.
0043.jpg
2008-02-12 Strengthening Works205 viewsAttachments for diagonal bracing are added to the top of an outer arched rib.
Img_1803a.jpg
2008-04-02 Gas Main Rerouting / First SHS Installation205 viewsThe SHS is guided into place with a clear view of the old steel gas main that will be removed from the bridge.
Img_1816a.jpg
2008-04-02 Gas Main Rerouting / First SHS Installation204 viewsYou can see here how that troublesome notching of the SHS ties up with the edge beam of the original bridge so the the new beam sits as low as possible.
299 files on 25 page(s) 22